Penyebab Keterlambatan Konstruksi Proyek Jalan Kota Di Provinsi Sumatera Barat

Authors

  • Taufika Ophiyandri Universitas Andalas
  • Rika Ampuh Hadiguna Universitas Andalas
  • Dea Honesti Universitas Andalas

DOI:

https://doi.org/10.25077/jbkd.1.2.109-114.2023

Keywords:

road project, city road, delay factors, owner perception, labour, worker

Abstract

The success of a construction project is determined by the suitability of time, cost and quality specified in the contract documents. However, construction project implementation sometimes experiences delays caused by various factors. Road projects are one of the construction projects that often experience delays in their implementation. Therefore, this research aims to identify the factors that cause delays in the implementation of city road projects in West Sumatra. The research objectives were achieved by conducting a questionnaire survey on 30 respondents who came from owners of the City Road project in West Sumatra who had work experience as Satker, Assistant, KPA, PPK, and PPTK. The data obtained was processed using descriptive statistical analysis. The results of the research show that the factors causing delays that often occur are four factors in the workforce indicator, with the highest frequency being the lack of skills of the workforce involved in road projects.

Downloads

Download data is not yet available.

Author Biographies

Taufika Ophiyandri, Universitas Andalas

1. Pendidikan Profesi Insinyur, Program Pascasarjana, Universitas Andalas, Padang, Sumatera Barat.
2. Departemen Teknik Sipil, Fakultas Teknik, Universitas Andalas, Padang, Sumatera Barat.

Rika Ampuh Hadiguna, Universitas Andalas

1. Pendidikan Profesi Insinyur, Program Pascasarjana, Universitas Andalas, Padang, Sumatera Barat.
2. Departemen Teknik Industri , Fakultas Teknik, Universitas Andalas, Padang, Sumatera Barat

References

Maddeppungeng, A., Intari, D. E., & Oktafiani, A. (2020). Studi Faktor Penyebab Keterlambatan Proyek Konstruksi Studi Kasus Proyek Pembangunan 6 Ruas Jalan Tol Dalam Kota Jakarta. Konstruksia, 11(1), 89-96.

Messah, Y. A., Widodo, T., & Adoe, M. L. (2013). Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung Di Kota Kupang. Jurnal Teknik Sipil, 2(2), 157-168.

Sanaky, M. M. (2021). Analisis Faktor-Faktor Keterlambatan Pada Proyek Pembangunan Gedung Asrama Man 1 Tulehu Maluku Tengah. Jurnal Simetrik, 11(1), 432-439.

Winanda, B. R., Ophiyandri, T., & Prihantony, D. I. (2016). ACE 3-Persepsi Owner Terhadap Faktor Penyebab Keterlambatan Pelaksanaan Proyek Jalan Kabupaten Di Provinsi Sumatera Barat. In Prosiding Seminar ACE, 139-156

Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2017). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Konstruksia, 6(1). 109-114.

jurnal BKD universitas andalas

Published

30-08-2023

How to Cite

Ophiyandri, T., Hadiguna, R. A., & Honesti, D. (2023). Penyebab Keterlambatan Konstruksi Proyek Jalan Kota Di Provinsi Sumatera Barat . Jurnal Bangunan, Konstruksi & Desain, 1(2), 109–114. https://doi.org/10.25077/jbkd.1.2.109-114.2023

Issue

Section

Articles